RDS 0.00% 0.5¢ redstone resources limited

assays for tollu project

  1. 309 Posts.
    Reading the quaterly report again it would seem that we will not see the assays from 5,000m RC drill program conducted at Tollu and reported on 22 September.

    "High water flow rates resulted in high copper sulphide loss from drill samples within the mineralised zones. This has made it difficult to properly evaluate the true copper grades intersected."

    To address this issue of sample loss a diamond drill program is now being planned to commence in the Dec qtr.

    Diamond drilling will provide decent samples however we will likely be waiting until next year to get the results. Drillers close mid Dec for Xmas, most labs close during Xmas and NY and Jan is slow for assay turn around due to sample backlog.

    So don't see much happening with the SP for a while yet IMO.
 
watchlist Created with Sketch. Add RDS (ASX) to my watchlist
(20min delay)
Last
0.5¢
Change
0.000(0.00%)
Mkt cap ! $4.627M
Open High Low Value Volume
0.5¢ 0.5¢ 0.5¢ $2.52K 504.0K

Buyers (Bids)

No. Vol. Price($)
4 30375250 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 10374266 7
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
RDS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.