PLA asset backing still at 35c/share. Debt liability 16M. May be they used Admin process to avoid have to go through all the legal procedures when shutdown a mine in SA.
LU7 The Breakdown: Lithium Universe talks refinery design and lithium processing in strong preliminary feasibility study for Bécancour