QPM 0.00% 3.3¢ queensland pacific metals limited

The KPMG Bowen Basin pipeline study phase 2 recommends stage 1...

  1. 2,487 Posts.
    lightbulb Created with Sketch. 417
    The KPMG Bowen Basin pipeline study phase 2 recommends stage 1 the southern section to Mahalo be running by 2028. The northern section stage 2 to Moranbah connected to stage 1 by 2030.....thanks to @Biometric on the BLU site.
 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
(20min delay)
Last
3.3¢
Change
0.000(0.00%)
Mkt cap ! $83.18M
Open High Low Value Volume
3.2¢ 3.3¢ 3.0¢ $425.0K 13.49M

Buyers (Bids)

No. Vol. Price($)
1 100556 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.4¢ 759250 5
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
QPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.