"Siemens Energy will provide integrated service solutions to convert the gas turbine to a Hybrid RGS during a scheduled major outage in 2025. Replacing the intermediate shaft of the gas turbine with a Synchro-Self-Shifting (SSS) clutch will provide an instantaneous switch from power generation to synchronous condenser mode. When in synchronous condenser mode, the Hybrid RGS unit can provide rotating inertia and short-circuit power without the need to produce power and is calculated to provide a short-circuit contribution of approximately 350 to 400 MVA. The electrical inertia while operating in the grid stabilization mode is calculated to be around 250 megawatt seconds (MW.s) and around 1,000MW.s while operating in power generation mode."
- Forums
- ASX - By Stock
- Associated News
QPM
qpm energy limited
Add to My Watchlist
0.00%
!
3.6¢

"Siemens Energy will provide integrated service solutions to...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
3.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $90.91M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1034061 | 3.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.5¢ | 700000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1034061 | 0.034 |
5 | 650189 | 0.033 |
2 | 156250 | 0.032 |
2 | 520000 | 0.031 |
10 | 328345 | 0.030 |
Price($) | Vol. | No. |
---|---|---|
0.035 | 700000 | 1 |
0.036 | 625038 | 3 |
0.037 | 1005000 | 3 |
0.038 | 185433 | 1 |
0.039 | 290480 | 4 |
Last trade - 07.10am 27/06/2025 (20 minute delay) ? |
Featured News
QPM (ASX) Chart |
Day chart unavailable
The Watchlist
PAR
PARADIGM BIOPHARMACEUTICALS LIMITED..
Paul Rennie, MD & Founder
Paul Rennie
MD & Founder
SPONSORED BY The Market Online