ASX ANN today
HCY 2:10 PM Third Quarter Activities Report
http://www.asx.com.au/asx/statistics/showAnnouncementPDF.do?idsID=00716144
For the Quarter Ending
31 March 2007
HIGHLIGHTS
Initial surface sampling at the Lake Marmion Uranium Project (which has increased in size by 37% to 42km2) has returned several results above 100ppm U3O8 highlighting the potential to host near surface uranium mineralisation.
The Bardoc Nickel Joint Venture with Minara Resources Ltd has approved and then drilled another four holes into the priority Western Zone nickel sulphide target, both along strike and down-dip to the drill intersections of 45 metres @ 0.5% Nickel, 0.05% Cobalt and 0.1% Copper from 21 metres and 2m @ 1.05% Nickel, 0.04%Cobalt and 0.12%Copper from 150 metres.
Strong drill results with assays of up to 15.3 g/t gold have extended the mineralisation to over 300 metres in strike length at the Big Blow North prospect.
HCY
halcyon group ltd
ASX ANN todayHCY 2:10 PM Third Quarter Activities Report...
Add to My Watchlist
What is My Watchlist?