88E 0.00% 0.2¢ 88 energy limited

Up up and away :):):):D:D RNS Number : 2191D 88 Energy Limited...

  1. 246 Posts.
    lightbulb Created with Sketch. 38
    Up up and away

    RNS Number : 2191D
    88 Energy Limited
    25 April 2017

    This Announcement contains Inside Information.

    25 April 2017

    88 Energy Limited

    Icewine#2 Drilling Commenced

    88 Energy Limited ("88 Energy", "the Company", "Operator") (ASX, AIM: 88E) is pleased to provide an update on Project Icewine, located onshore North Slope of Alaska.
    Highlights
    · Spud of Icewine#2 Production Test well occurred at 1915 24th April (Alaska time)
    o Arctic Fox currently drilling ahead

    Icewine#2 Drilling Commenced

    Drilling at the Icewine#2 Production Test well commenced at 1915 24th April (Alaska time). The Arctic Fox rig is currently drilling ahead in the surface hole.

    Production testing remains on schedule for late June / early July.

    Further updates will be made as and when appropriate throughout the drilling / testing program.

    Managing Director of 88 Energy Limited, Dave Wall commented:
    "The spud of Icewine#2 represents another milestone for the Company and its shareholders and we now look forward to a safe operation, above all else.
    It is only a few short weeks before production testing begins, which could unlock the huge resource potential of the HRZ shale play."
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.86M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $6.36K 3.180M

Buyers (Bids)

No. Vol. Price($)
6 3816389 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 578884190 214
View Market Depth
Last trade - 13.38pm 01/11/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.