88E 0.00% 0.2¢ 88 energy limited

Copied your quote over to here redgie Both stages of the planned...

  1. 279 Posts.
    lightbulb Created with Sketch. 13
    Copied your quote over to here redgie

    Both stages of the planned two stage fracture stimulation operation have now been executed successfully as per the stimulation design. Over ninety eight percent of the intended total proppant volume was able to be injected into the HRZ reservoir.

    Flowback will now commence from the upper zone until a representative sample can be obtained. ... Sample analysis will take place in a lab over the next four to six weeks to allow for detailed characterisation of the hydrocarbon composition and phase in the reservoir.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $57.86M
Open High Low Value Volume
0.2¢ 0.3¢ 0.2¢ $2.871K 1.430M

Buyers (Bids)

No. Vol. Price($)
237 229711066 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 542559084 199
View Market Depth
Last trade - 16.10pm 09/08/2024 (20 minute delay) ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.