Re the “high strip ratio” … as you well know, that little red herring has been put to bed long ago and now covered up with the full funding to stage 1 production of 2.5Mtpa output. That funding includes removal of overburden for that part of the operation which is open cut as well as portal creation and entry down to the underground operation section (as you know from reading the recent DFS).
From there there’s no “strip ratio” worth mentioning as it’s underground. Perhaps you’d like to correct your misleading statement to include the detail and maybe you’d like to also note the “fully funded to stage 1 production” part too. Wouldn’t mind seeing the detail behind your “high opex” comment too as that doesn’t correlate with information from LTR.
But if not, that’s ok. Either way, thanks for providing the chance to better spread the LTR news.
- Forums
- ASX - By Stock
- LTR
- ASX Today
ASX Today, page-14973
-
- There are more pages in this discussion • 29,745 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
77.0¢ |
Change
-0.035(4.35%) |
Mkt cap ! $1.867B |
Open | High | Low | Value | Volume |
80.5¢ | 80.5¢ | 75.5¢ | $10.59M | 13.72M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 48744 | 77.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
77.5¢ | 154943 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 48744 | 0.770 |
10 | 350343 | 0.765 |
20 | 280938 | 0.760 |
11 | 197049 | 0.755 |
55 | 332528 | 0.750 |
Price($) | Vol. | No. |
---|---|---|
0.775 | 134943 | 4 |
0.780 | 40977 | 3 |
0.785 | 60175 | 5 |
0.790 | 94450 | 4 |
0.795 | 70650 | 2 |
Last trade - 16.10pm 03/10/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |