As for my understanding if you feed SC6 concentrate in to a Li hydroxide calcinator you get the maximum out put. Any lower than SC6 concentrate creates high wasteage you will need to feed extra concentrate to achieve required battery grade hydroxide. When you add up cost for extra Li concentrate tonage and the cost to run calcinator longer plus the extra specialised man power SC6 alway be first choice.
- Forums
- ASX - By Stock
- ASX Today
As for my understanding if you feed SC6 concentrate in to a Li...
- There are more pages in this discussion • 12,727 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.23 |
Change
0.000(0.00%) |
Mkt cap ! $2.970B |
Open | High | Low | Value | Volume |
$1.23 | $1.24 | $1.20 | $6.000M | 4.926M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | $1.23 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.23 | 25711 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 1.225 |
2 | 21559 | 1.220 |
3 | 23420 | 1.215 |
7 | 161354 | 1.210 |
1 | 33061 | 1.205 |
Price($) | Vol. | No. |
---|---|---|
1.230 | 25711 | 4 |
1.235 | 71382 | 5 |
1.240 | 37411 | 3 |
1.245 | 53629 | 3 |
1.250 | 6675 | 5 |
Last trade - 16.10pm 02/05/2024 (20 minute delay) ? |
|
|||||
Last
$1.22 |
  |
Change
0.000 ( 0.91 %) |
|||
Open | High | Low | Volume | ||
$1.24 | $1.24 | $1.20 | 1572354 | ||
Last updated 15.59pm 02/05/2024 ? |
Featured News
LTR (ASX) Chart |
The Watchlist
RDN
RAIDEN RESOURCES LIMITED
Dusko Ljubojevic, MD
Dusko Ljubojevic
MD
SPONSORED BY The Market Online