@kevin103
"...i am sure it is just a very short hiatus at KV and they will resumt drilling in ernest once the KV resource upgrade is out of the way."
Would you mind unpacking with a hypothetical post JORC result say of a significant increased capacity at KV. I mean what would more positive drilling results mean (apart from the obvious benefit to the SP); another JORC or some other rerating(s)?
Just an engineer and not great at admin theory. Not even sure if I'm asking the right questions.
.
- Forums
- ASX - By Stock
- LTR
- ASX Today
ASX Today, page-35
-
-
- There are more pages in this discussion • 41,165 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
90.5¢ |
Change
-0.020(2.16%) |
Mkt cap ! $2.194B |
Open | High | Low | Value | Volume |
91.0¢ | 93.5¢ | 89.0¢ | $26.09M | 28.68M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 472933 | 90.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
90.5¢ | 446423 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 5786 | 0.900 |
4 | 110000 | 0.895 |
34 | 321661 | 0.890 |
8 | 180544 | 0.885 |
17 | 389749 | 0.880 |
Price($) | Vol. | No. |
---|---|---|
0.905 | 22997 | 2 |
0.910 | 105000 | 5 |
0.915 | 95187 | 4 |
0.920 | 25500 | 1 |
0.925 | 44911 | 4 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online