LTR 2.46% 62.5¢ liontown resources limited

ASX Today, page-40072

  1. 9,113 Posts.
    lightbulb Created with Sketch. 17869
    No.

    If the feed ore grades 1.5% Li20, then you need 5 tonnes ore at 80% recovery rate to produce 1 tonne 6% grade concentrate (i.e. 1.5% * 5 * 80% = 6% grade concentrate). That means 2.5mtpa orefeed results in 500,000 tonnes 6% gade spodumene concentrate.

    Noting though LTR is actually building a 3mtpa facility (stage 1), with a view to expanding orefeed capacity to 4mtpa down the track.

    Achieving recovery rate is the key as the recovery rate is a key to costs per tonne.

    Quality is also about producing concentrate on spec, and LTR has that ability as the ore has low deleterious elements. Further info in:

    https://hotcopper.com.au/posts/71113718/single

    Hope that helps.

    All IMO
 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
(20min delay)
Last
62.5¢
Change
0.015(2.46%)
Mkt cap ! $1.515B
Open High Low Value Volume
62.0¢ 64.5¢ 61.5¢ $9.865M 15.67M

Buyers (Bids)

No. Vol. Price($)
11 230271 62.5¢
 

Sellers (Offers)

Price($) Vol. No.
63.0¢ 56900 4
View Market Depth
Last trade - 16.10pm 05/09/2024 (20 minute delay) ?
LTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.