No.
If the feed ore grades 1.5% Li20, then you need 5 tonnes ore at 80% recovery rate to produce 1 tonne 6% grade concentrate (i.e. 1.5% * 5 * 80% = 6% grade concentrate). That means 2.5mtpa orefeed results in 500,000 tonnes 6% gade spodumene concentrate.
Noting though LTR is actually building a 3mtpa facility (stage 1), with a view to expanding orefeed capacity to 4mtpa down the track.
Achieving recovery rate is the key as the recovery rate is a key to costs per tonne.
Quality is also about producing concentrate on spec, and LTR has that ability as the ore has low deleterious elements. Further info in:
https://hotcopper.com.au/posts/71113718/single
Hope that helps.
All IMO
- Forums
- ASX - By Stock
- ASX Today
No.If the feed ore grades 1.5% Li20, then you need 5 tonnes ore...
-
- There are more pages in this discussion • 1,269 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
|
|||||
Last
91.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $2.218B |
Open | High | Low | Value | Volume |
91.5¢ | 94.0¢ | 90.3¢ | $11.62M | 12.67M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 119641 | 91.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
92.0¢ | 140664 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 119641 | 0.915 |
3 | 26547 | 0.910 |
12 | 179891 | 0.905 |
23 | 287317 | 0.900 |
7 | 172266 | 0.895 |
Price($) | Vol. | No. |
---|---|---|
0.920 | 64000 | 4 |
0.925 | 218845 | 4 |
0.930 | 34000 | 4 |
0.935 | 89934 | 4 |
0.940 | 306347 | 10 |
Last trade - 16.10pm 05/07/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |