No.
If the feed ore grades 1.5% Li20, then you need 5 tonnes ore at 80% recovery rate to produce 1 tonne 6% grade concentrate (i.e. 1.5% * 5 * 80% = 6% grade concentrate). That means 2.5mtpa orefeed results in 500,000 tonnes 6% gade spodumene concentrate.
Noting though LTR is actually building a 3mtpa facility (stage 1), with a view to expanding orefeed capacity to 4mtpa down the track.
Achieving recovery rate is the key as the recovery rate is a key to costs per tonne.
Quality is also about producing concentrate on spec, and LTR has that ability as the ore has low deleterious elements. Further info in:
https://hotcopper.com.au/posts/71113718/single
Hope that helps.
All IMO
- Forums
- ASX - By Stock
- ASX Today
No.If the feed ore grades 1.5% Li20, then you need 5 tonnes ore...
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
88.0¢ |
Change
0.005(0.57%) |
Mkt cap ! $2.134B |
Open | High | Low | Value | Volume |
85.0¢ | 88.0¢ | 83.5¢ | $10.59M | 12.37M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6000 | 86.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
88.0¢ | 137580 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6000 | 0.865 |
8 | 87960 | 0.860 |
1 | 42542 | 0.855 |
5 | 56694 | 0.850 |
5 | 94498 | 0.845 |
Price($) | Vol. | No. |
---|---|---|
0.880 | 136080 | 9 |
0.885 | 59500 | 3 |
0.890 | 302208 | 11 |
0.895 | 104478 | 9 |
0.900 | 354861 | 35 |
Last trade - 16.10pm 13/11/2024 (20 minute delay) ? |
Featured News
LTR (ASX) Chart |