Why compare against PLS when based on LTR's DFS, its NPV for the project was at $4.2B with an assumed price of close to US$1400/T, if we even assume that to be the long run sustainable price, the upside is just up to $1.75 ((4.2B/2.82B)*$1.17=$1.75). And this is based on conditions and assumptions prevailing at the time the DFS was drawn up, needs to be updated for banks with all the revised upward capex and cost assumptions.
- Forums
- ASX - By Stock
- LTR
- ASX Today
ASX Today, page-39277
- There are more pages in this discussion • 1,084 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.46 |
Change
-0.035(2.35%) |
Mkt cap ! $3.527B |
Open | High | Low | Value | Volume |
$1.49 | $1.52 | $1.46 | $11.18M | 7.628M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 24171 | $1.46 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.46 | 15499 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 24171 | 1.455 |
15 | 280038 | 1.450 |
3 | 48994 | 1.445 |
8 | 163835 | 1.440 |
4 | 66422 | 1.435 |
Price($) | Vol. | No. |
---|---|---|
1.460 | 15499 | 4 |
1.465 | 72907 | 6 |
1.470 | 181259 | 10 |
1.475 | 81061 | 7 |
1.480 | 80414 | 8 |
Last trade - 16.10pm 21/05/2024 (20 minute delay) ? |
|
|||||
Last
$1.46 |
  |
Change
-0.035 ( 1.71 %) |
|||
Open | High | Low | Volume | ||
$1.51 | $1.51 | $1.46 | 2032239 | ||
Last updated 15.59pm 21/05/2024 ? |
Featured News
LTR (ASX) Chart |
The Watchlist
AUQ
ALARA RESOURCES LIMITED
Stephen Gethin, Non-Executive Director & Chairman
Stephen Gethin
Non-Executive Director & Chairman
Previous Video
Next Video
SPONSORED BY The Market Online