No.
If the feed ore grades 1.5% Li20, then you need 5 tonnes ore at 80% recovery rate to produce 1 tonne 6% grade concentrate (i.e. 1.5% * 5 * 80% = 6% grade concentrate). That means 2.5mtpa orefeed results in 500,000 tonnes 6% gade spodumene concentrate.
Noting though LTR is actually building a 3mtpa facility (stage 1), with a view to expanding orefeed capacity to 4mtpa down the track.
Achieving recovery rate is the key as the recovery rate is a key to costs per tonne.
Quality is also about producing concentrate on spec, and LTR has that ability as the ore has low deleterious elements. Further info in:
https://hotcopper.com.au/posts/71113718/single
Hope that helps.
All IMO
- Forums
- ASX - By Stock
- ASX Today
No.If the feed ore grades 1.5% Li20, then you need 5 tonnes ore...
- There are more pages in this discussion • 326 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LTR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.44 |
Change
-0.020(1.37%) |
Mkt cap ! $3.479B |
Open | High | Low | Value | Volume |
$1.47 | $1.48 | $1.42 | $10.68M | 7.408M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 27894 | $1.44 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.44 | 113600 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 100 | 1.425 |
4 | 49916 | 1.420 |
8 | 205011 | 1.415 |
5 | 74145 | 1.410 |
5 | 50795 | 1.405 |
Price($) | Vol. | No. |
---|---|---|
1.440 | 113600 | 4 |
1.445 | 15751 | 2 |
1.450 | 78000 | 4 |
1.455 | 10000 | 1 |
1.460 | 51294 | 6 |
Last trade - 16.10pm 22/05/2024 (20 minute delay) ? |
|
|||||
Last
$1.44 |
  |
Change
-0.020 ( 1.56 %) |
|||
Open | High | Low | Volume | ||
$1.46 | $1.48 | $1.42 | 2432020 | ||
Last updated 15.59pm 22/05/2024 ? |
Featured News
LTR (ASX) Chart |
The Watchlist
RDN
RAIDEN RESOURCES LIMITED
Dusko Ljubojevic, MD
Dusko Ljubojevic
MD
SPONSORED BY The Market Online