LTR 4.15% $1.04 liontown resources limited

ASX Today, page-40072

  1. 9,070 Posts.
    lightbulb Created with Sketch. 17547
    No.

    If the feed ore grades 1.5% Li20, then you need 5 tonnes ore at 80% recovery rate to produce 1 tonne 6% grade concentrate (i.e. 1.5% * 5 * 80% = 6% grade concentrate). That means 2.5mtpa orefeed results in 500,000 tonnes 6% gade spodumene concentrate.

    Noting though LTR is actually building a 3mtpa facility (stage 1), with a view to expanding orefeed capacity to 4mtpa down the track.

    Achieving recovery rate is the key as the recovery rate is a key to costs per tonne.

    Quality is also about producing concentrate on spec, and LTR has that ability as the ore has low deleterious elements. Further info in:

    https://hotcopper.com.au/posts/71113718/single

    Hope that helps.

    All IMO
 
watchlist Created with Sketch. Add LTR (ASX) to my watchlist
(20min delay)
Last
$1.04
Change
-0.045(4.15%)
Mkt cap ! $2.521B
Open High Low Value Volume
$1.07 $1.08 $1.04 $10.81M 10.31M

Buyers (Bids)

No. Vol. Price($)
33 339507 $1.04
 

Sellers (Offers)

Price($) Vol. No.
$1.05 120794 2
View Market Depth
Last trade - 16.10pm 14/06/2024 (20 minute delay) ?
Last
$1.05
  Change
-0.045 ( 4.12 %)
Open High Low Volume
$1.06 $1.08 $1.04 2904342
Last updated 16.00pm 14/06/2024 ?
LTR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.