"They said that it will only take a week to actually drill to TD."
One week to drill circa 3900m of hole????
Once you take out the tripping time and time spent on at least two casing jobs you'd have to be drilling at an impossibly high ROP to get to TD in one week.
Two to three weeks at best till were rigging up for TD wireline logs.
- Forums
- ASX - By Stock
- IVZ
- Aug 17 Fireside Chat with JRI and Scott Macmillan
Aug 17 Fireside Chat with JRI and Scott Macmillan, page-284
-
-
- There are more pages in this discussion • 244 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
6.5¢ |
Change
-0.004(5.80%) |
Mkt cap ! $92.16M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.3¢ | $224.0K | 3.422M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 95613 | 6.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 5326 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 95613 | 0.063 |
3 | 375000 | 0.062 |
5 | 108786 | 0.061 |
11 | 1615055 | 0.060 |
4 | 850000 | 0.059 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 5326 | 1 |
0.067 | 100000 | 1 |
0.068 | 494634 | 1 |
0.069 | 734009 | 2 |
0.070 | 482500 | 3 |
Last trade - 16.10pm 24/06/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |