IVZ 4.05% 7.1¢ invictus energy ltd

Aug 17 Fireside Chat with JRI and Scott Macmillan, page-315

  1. 9,887 Posts.
    lightbulb Created with Sketch. 3287
    “Drill time to be quick roughly 1 week due to the simple nature of the upcoming well” - khaijor

    How long does it take to drill, case etc to the 8.5” section? I stand by my statement…..you got your wires crossed…..either that or you deliberately left out the weeks of drilling to the 8.5” rolleyes.png
    Last edited by jakspara: 17/08/23
 
watchlist Created with Sketch. Add IVZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.