Really excited for this - thanks so much for organising! Main questions:
- When rig mobilisation is set to start, and a more definitive planned spud date.
- What timeframes are we looking for for completion of the processing of the latest round of seismic, and issuance of resource estimates for the additional leads and prospects.
- What are the plans post-Mk2 in the events of either success or failure - i.e. drilling of a basin margin prospect, flow testing. And could both be done simultaneously? Given we have the exalo rig warm-stacked it feels like we should be utilising it to the greatest degree possible.
- What contingencies are in place should similar issues to Mk-1 be encountered at Mk-2, to allow us the greatest chance of getting a sample to surface.
- Forums
- ASX - By Stock
- IVZ
- Aug 17 Fireside Chat with JRI and Scott Macmillan
Aug 17 Fireside Chat with JRI and Scott Macmillan, page-8
-
- There are more pages in this discussion • 520 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
|
|||||
Last
8.7¢ |
Change
-0.001(1.14%) |
Mkt cap ! $123.3M |
Open | High | Low | Value | Volume |
8.9¢ | 8.9¢ | 8.4¢ | $496.7K | 5.718M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 10998 | 8.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.9¢ | 400000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 10998 | 0.087 |
1 | 100000 | 0.086 |
1 | 14457 | 0.085 |
8 | 364119 | 0.084 |
4 | 383830 | 0.083 |
Price($) | Vol. | No. |
---|---|---|
0.089 | 400000 | 1 |
0.090 | 250000 | 1 |
0.091 | 315000 | 2 |
0.092 | 325000 | 2 |
0.093 | 360000 | 5 |
Last trade - 16.10pm 30/07/2024 (20 minute delay) ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online