Really excited for this - thanks so much for organising! Main questions:
- When rig mobilisation is set to start, and a more definitive planned spud date.
- What timeframes are we looking for for completion of the processing of the latest round of seismic, and issuance of resource estimates for the additional leads and prospects.
- What are the plans post-Mk2 in the events of either success or failure - i.e. drilling of a basin margin prospect, flow testing. And could both be done simultaneously? Given we have the exalo rig warm-stacked it feels like we should be utilising it to the greatest degree possible.
- What contingencies are in place should similar issues to Mk-1 be encountered at Mk-2, to allow us the greatest chance of getting a sample to surface.
- Forums
- ASX - By Stock
- IVZ
- Aug 17 Fireside Chat with JRI and Scott Macmillan
Aug 17 Fireside Chat with JRI and Scott Macmillan, page-8
- There are more pages in this discussion • 520 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.3¢ |
Change
-0.002(3.08%) |
Mkt cap ! $89.32M |
Open | High | Low | Value | Volume |
6.3¢ | 6.6¢ | 6.1¢ | $225.3K | 3.574M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 189436 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.3¢ | 8856 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 189436 | 0.061 |
4 | 437920 | 0.060 |
3 | 63698 | 0.059 |
4 | 665808 | 0.058 |
3 | 135104 | 0.057 |
Price($) | Vol. | No. |
---|---|---|
0.063 | 8856 | 1 |
0.064 | 606200 | 3 |
0.066 | 2463 | 1 |
0.067 | 224226 | 2 |
0.069 | 89649 | 1 |
Last trade - 16.10pm 04/06/2024 (20 minute delay) ? |
|
|||||
Last
6.2¢ |
  |
Change
-0.002 ( 4.62 %) |
|||
Open | High | Low | Volume | ||
6.3¢ | 6.6¢ | 6.1¢ | 1677559 | ||
Last updated 15.57pm 04/06/2024 ? |
Featured News
IVZ (ASX) Chart |