The breakdown was flagged in the presentation to the US Fuel Cell Seminar back in November. See slide 15 of this presentation.
And also slide, per slide 20 the unit at Alliander has run longer without any major problems.
http://www.cfcl.com.au/Assets/Files/20111122_CFC_Presentation-US_fuel_cell_seminar_2011.pdf