Found fraccing details in Beach drilling report yesterday:
Beach Operated Cooper Basin Unconventional Gas Program Workover operations have successfully cleaned out the Encounter-1 wellbore in PEL 218 (Beach 100%). Tubing will now be installed ready for the fracture stimulation activities which are now expected to occur in early April once the fracture stimulation crew has completed a program with the Cooper Basin Joint Venture (Beach 20.21%)
Nothing mentioned about weather delay and Halliburton not mentioned but it seems safe to assume it has to be their rig.
NWE Price at posting:
5.5¢ Sentiment: Buy Disclosure: Held