Australia ‘can afford’ nuclear power, page-8

  1. 8,390 Posts.
    lightbulb Created with Sketch. 346
    around 6 to 8 years

    It takes around 6 to 8 years to build a nuclear reactor. That's the average construction time globally. Reactors can be built very quickly: some have been built in just 3 to 5 years. Some have long over-runs, spanning multiple decades.3 Apr 2023

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.