" The European Pressurised Reactor, which is the model for France’s new generation of power plants, was completed 12 years late and four times over budget. "
https://www.france24.com/en/live-news/20240905-new-french-nuclear-reactor-enters-automatic-shutdown
- Forums
- Political Debate
- Australia MUST consider nuclear power.
" The European Pressurised Reactor, which is the model for...
-
- There are more pages in this discussion • 309 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
SPONSORED BY The Market Online