SDL 0.00% 0.6¢ sundance resources limited

australian article, page-33

  1. 8,602 Posts.
    lightbulb Created with Sketch. 40
    Hi (bigstar)

    I am not sure what we end up with,I think it will be around 1 billion tonnes after beneficiation.I think it is 40+% recovery.

    The Itabirite goes very deep,could end up at 1000mts deep.
    Mine pit is designed to go to 400mts deep,they have drilled to 600 mts deep with the Itabirite still open at depth.
    The Indicated resource is on a drill pattern of 100m x 200m at Mbarga and 200m x 100mt for infrared at Mbarga,Mbarga South and Metzimevin deposits.Hopefully the resource will increase as they get to drill at measured resource distances of I believe 50m x 25m.

    At Mbarga the Itabirite has quite a bit of DSO running down through it.I did post on it recently and think it was from memory around 100 to 150mts wide to a depth of 400mts deep and still open at depth,I could not say how long the DSO was with out the picture going in the opposite direction.There are other areas of DSO also in the Itabirite at Mbarga as well.
    SDL do not count this DSO as such because it is mixed in between the Itabirite.

    Regards
    Westcott.
 
watchlist Created with Sketch. Add SDL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.