SDL 0.00% 0.6¢ sundance resources limited

australian article, page-37

  1. 1,195 Posts.
    lightbulb Created with Sketch. 2
    Hi (Westcott),

    let say, with a weight recoveries of 40+%, a beneficiation of 2,300MT Itabirite would result in around 1 Billion tonnes of +65Fe concentrate (high grade product).

    So with an estimates of 5 Billion tonne of Itabirite, we would have around 2 Billion tonnes of High grade, after beneficiation.

    We'll end up with an estimates of 2.5 Billions tonnes of High Grade (500MT DSO with +60Fe + 2 Billion tonnes with +65Fe concentrate).

    Is it Right? Again this is our assumption.

    Thanks,
    Cheers

 
watchlist Created with Sketch. Add SDL (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.