Libs’ nuclear case ‘crumbling like sao in blender’Energy...

  1. 2,514 Posts.
    lightbulb Created with Sketch. 25
    Libs’ nuclear case ‘crumbling like sao in blender’Energy Minister Chris Bowen has disputed claims by his opposition counterpart Ted O’Brien that a nuclear reactor could be built in Australia within 10 years.

    Defining energy debate of the year – Dutton has now made it clear he is all in on nuclear

    The debate about cost is a valid one. The next generation APR-1400 nuclear reactors – four of which have just been completed in South Korea at a cost of $US20bn – will produce up to 1.5 gigawatts of power.

    The concern about where to put them.. what electorate.. what voting block will support it.. for the 10 -20yrs it takes to build ONE.
    hat why should regional Australia bear the brunt of Nuclear powerplants risk.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.