FAR 0.00% 49.5¢ far limited

The DWOP usually takes place after months of well design and...

  1. 289 Posts.
    lightbulb Created with Sketch. 36
    The DWOP usually takes place after months of well design and planning in order to identify and notify all connected with the execution of any matters concerning them. It is usually done within weeks not months from mobilization in order to enable change management. I’m my experience to do it months from mobilization is not normal unless revised dwop is planned nearer the mobilization date. So two scenarios here, they are planning to mobilize the rig within a month or two at most or they relying on doing a revised dwop after that period. In my opinion to do this now and not drill till well in to November or December is not usual. I’m betting an announcement will come forthcoming that a rig mob date is imminent and will most likely be in October. Cheers.
 
watchlist Created with Sketch. Add FAR (ASX) to my watchlist
(20min delay)
Last
49.5¢
Change
0.000(0.00%)
Mkt cap ! $45.74M
Open High Low Value Volume
51.0¢ 51.0¢ 49.5¢ $14.63K 29.41K

Buyers (Bids)

No. Vol. Price($)
3 49748 49.5¢
 

Sellers (Offers)

Price($) Vol. No.
50.0¢ 9861 1
View Market Depth
Last trade - 16.10pm 16/07/2024 (20 minute delay) ?
FAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.