It can only get better at this stage.
Once the processing equipment is online processing 40-60 tonnes of ore per day at 4g/t.
160 - 240 grams per day sounds pretty good to me. Do the math.
The 4 grams per tonne of ore was also using the 'very low grade, easy to access ore', so can be considered a conservative figure.