Costings are moot at this juncture as it is imperative that Australia has sufficient base load power for the future, for as sure as eggs, we will need it as renewables, as good as they are, just won't cut it. They are very limited in total power requirements and reliability, let alone short life span expensive battery back-up.
Can you provide, or do you ever expect the mad Bowen to release the total cost of government subsidised renewables, or the total ecological impact?
The ALP are happy to continue along their mad rush for the unachievable 100% power generation much of which, like the NBN I suspect is off budget and hidden.
About time they were exposed for their deceit in pushing the extremely expensive, short life term, recurring care and maintenance, renewable roll out extravaganza out of control under the serial failure Bowen.
- Forums
- Political Debate
- Australia's Nuclear Future
Australia's Nuclear Future, page-588
-
- There are more pages in this discussion • 263 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)