Hi ura
Yes, as I also didn't add the much larger mining workforces, explosive costs, building the underground crushers and conveyors and the maintence crews associated with these additional underground systems. Just maintaing what is called jumbos these are HV powered drilling machines that drill the face to place explosives and also drill the roof and sides to add mesh and rockbolt which is followed by a shotcrete team that spray a cement based coating to hold the roof and sidewalls loose material from possibly dislodging and hitting men and machines, takes a team of sparkies to continually extending the HV cables powering these machines and following placing lighting in the constantly extending tunnels.
I hold both laterite and sulphide stocks and take all this in consideration for capex and opex costs.
- Forums
- ASX - By Stock
- AUZ
- AUZ Chart
AUZ Chart, page-2366
-
- There are more pages in this discussion • 4,554 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.4¢ |
Change
0.002(16.7%) |
Mkt cap ! $19.57M |
Open | High | Low | Value | Volume |
1.3¢ | 1.5¢ | 1.2¢ | $652.5K | 47.13M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 10700000 | 1.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.5¢ | 5126249 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 9200000 | 0.014 |
7 | 18735430 | 0.013 |
6 | 19170000 | 0.012 |
15 | 12353920 | 0.011 |
16 | 21225994 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.015 | 2620159 | 6 |
0.016 | 7066881 | 11 |
0.017 | 3918993 | 10 |
0.018 | 2040774 | 5 |
0.019 | 1944999 | 5 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
AUZ (ASX) Chart |