AVANCO EXCEEDS HALF MILLION TONNES OF CONTAINED COPPER The Company is pleased to report an exceptional 49% growth1 in JORC Reported Mineral Resources at the (Stage II) Pedra Branca Project. This interim upgrade increases the Company’s resource inventory to 555,000t of contained copper. The Company’s JORC Reported Mineral Resource Inventory for its Brazilian Stage I & II Projects now stands at: 45.43Mt at 1.22% Copper, 0.30g/t Gold for 555,000 tonnes of contained Copper and 445,000oz of Gold This Stage II upgrade is attributed to: thickening of the Eastern zone, discovery of additional mineralisation at the Western zone and consistency of good results across wide spaced (100m x 100m) drilling. The increase is an exceptional outcome from only 10 new drill holes and illustrates the ease and potential for continued Stage II growth. With only 40% of the programme completed, Stage II remains completely open with step-out drilling yet to reach the limits of mineralisation in any direction. Avanco is within reach of the +600,000t target required to support a +30,000tpa production objective from its Stage I and Stage II Carajas copper projects.
AVB Price at posting:
5.7¢ Sentiment: Buy Disclosure: Held