Anyone have any idea the actual average daily rates payable by the JV for the 2 rigs?
Details for the two drills are:
Cua Lo
Rig type: Jackup
Water depth: 76m
Estimated cost (dry hole): $35.3m
Estimate duration: ?
Average daily rate: ?
Ca Ngu
Rig type: Semi-sub
Water depth: 270m
Estimated cost: $39m
Estimate duration (dry hole): ?
Average daily rate: ?
Also, any ideas about what the production test at Cua Lo would cost? Same as the normal daily rate or is additional cost applicable?
- Forums
- ASX - By Stock
- average daily rates for rigs
Anyone have any idea the actual average daily rates payable by...
-
- There are more pages in this discussion • 4 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NEN (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
I88
INFINI RESOURCES LIMITED
Charles Armstrong, CEO
Charles Armstrong
CEO
SPONSORED BY The Market Online