I wonder if Nigel would be thinking about the Tin deal and if it would be better to go back out to market. From what I am hearing it’s the same interested party they have been dealing with all along. The sticking points were around processing plant and other finer deals.
Given where the price is with Tin surely we could ask for a massive upfront fee which would cover the majority of the $550mil needed for mining setup.
- Forums
- ASX - By Stock
- AVZ
- AVZ - Future World No.1 lowest cost SC6 producer
AVZ - Future World No.1 lowest cost SC6 producer, page-61
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)