Typical of the way down-rampers work = that is 2011 costs in Australia - as from this statement in the reference.
"A 10 hole combined RC and diamond drill program in 2011 to test the continuity and extent of gold mineralization intersected during 2008 at the Wealth of Nations Prospect;"
And that is for drilling to test continuity and extent - whereas at Storm a lot of expense goes into Geophys from ground base ML and chopper mounted Mags to locate targets. Then to move drills into new areas in the huge extent of Storm tenements.
The drilling efforts are chalk and cheese - serevi has miss-led us.
No doubt it is more expensive - maybe even 50% more ?
- Forums
- ASX - By Stock
- AW1 General Chat
Typical of the way down-rampers work = that is 2011 costs in...
-
- There are more pages in this discussion • 733 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AW1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $64.77M |
Open | High | Low | Value | Volume |
13.0¢ | 13.0¢ | 12.5¢ | $220.9K | 1.735M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 411285 | 12.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
13.0¢ | 851334 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 411285 | 0.125 |
5 | 1250329 | 0.120 |
5 | 837500 | 0.115 |
10 | 899999 | 0.110 |
5 | 457500 | 0.105 |
Price($) | Vol. | No. |
---|---|---|
0.130 | 851334 | 4 |
0.135 | 421945 | 6 |
0.140 | 966319 | 9 |
0.145 | 412432 | 9 |
0.150 | 569357 | 7 |
Last trade - 16.10pm 03/09/2024 (20 minute delay) ? |
Featured News
AW1 (ASX) Chart |