I was able to replicate similar numbers quite easily...you can get these depending on the cut-off you would like to apply i.e for me it was in the range 0.8 - 1 %. IMO the Target Area 1 estimate is very conservative, the wire frames they used appear to be guided from the Leapfrog volume circa 1 - 1.2%. However the system could easily be extended significantly further in the South to similar depths demonstrated by ANRD0017 (image below 'down plunge extension'). If I were the exploration/resource geo on this project, I would be seeking to drill out this Southern extension area as a priority as quickly as possible to make it into the maiden, I don't believe this upside has been captured within the 'Exploration Target' range. Note the image below is a long section view along the system, section lines hanging in space as shown.
That was a good little waste of a morning to give me some confidence that it's all hanging together and has a long way to go.
- Forums
- ASX - By Stock
- AZS Media related thread
I was able to replicate similar numbers quite easily...you can...
-
- There are more pages in this discussion • 661 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.69 |
Change
0.000(0.00%) |
Mkt cap ! $1.692B |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AZS (ASX) Chart |
Day chart unavailable