I had a bit more time last night and fixed some minor drill hole database errors the Leapfrog flagged when assigning zero's (also missing a collar for ANRC0017), unfortunately I didn't save it before making these changes. I could go back and re-import the original database with these errors and see the difference and tell you all, but I would rather work towards constant improvement. In doing this adjustment I will admit I lost some material, but the good news is adding ANDD0199 added nearly all of this back in.. So it's 46Mt @ 1.24% when cut off at 1% ( 87Mt @ 1.07 when cut 0.8) With the addition of this new hole it added ~7% more tonnes all things being equal when I did a before and after check. But more important than this rubbery figure, it's a good hit that adds to the continuity of the system to the south where the system remains completely open with good grade thickness.
- Forums
- ASX - By Stock
- AZS Media related thread
I had a bit more time last night and fixed some minor drill hole...
-
- There are more pages in this discussion • 646 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AZS (ASX) to my watchlist
(20min delay)
|
|||||
Last
$3.69 |
Change
0.000(0.00%) |
Mkt cap ! $1.692B |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AZS (ASX) Chart |
Day chart unavailable