AZS 0.00% $3.69 azure minerals limited

azure hits 40percent copper at promontorio

  1. 20,449 Posts.
    lightbulb Created with Sketch. 268

    AZURE HITS +40% COPPER AT PROMONTORIO

    On 13th August Azure Minerals Limited (ASX: AZS) announced that results of the mineralised intercept in drillhole APR-DD-009 were delayed due to the presence of three very high grade copper samples. Those copper grades required re-analysis using a specialised technique as they were too high for standard analytical methods.
    The Company is pleased to advise that it has now received those outstanding assays, which to date are the highest copper grades returned from the Promontorio Project, being:
    • 0.50 metres @ 43.9% copper from 86.00m;
    • 0.50 metres @ 46.6% copper from 90.25m; and
    • 0.40 metres @ 44.2% copper from 130.60m.
    These samples are contained within wider zones of massive sulphide mineralisation which returned the following exceptional high grade intercepts:
    Mina Vieja Vein
    • 9.40 metres @ 12.5% copper, 3.9g/t gold & 266g/t silver from 82.00m;
    including: 2.65 metres @ 27.7% copper, 7.4g/t gold & 501g/t silver from 84.50m;
    and: 1.35 metres @ 28.1% copper, 6.1g/t gold & 654g/t silver from 89.75m.
    Veta Grande Vein
    • 1.40 metres @ 20.7% copper, 1.2g/t gold & 270g/t silver from 130.60m;
    including: 0.80 metres @ 35.6% copper, 1.8g/t gold & 455g/t silver from 130.60m.
    To date Azure has completed drilling 29 holes for a total of 5,239 metres, and analytical results have been received for drillholes APR-DD-001 to 010. Resource definition drilling is continuing and the Company is on track to complete and publish a Mineral Resource in the fourth quarter of 2008.
    -ENDS-
    For further information, please contact:
    Tony Rovira Shane Murphy
    Executive Chairman Porter Novelli
    Azure Minerals Ltd +61 8 9386 1233
    +61 8 9481 2555 +61 (0)420 945 291
    Or visit www.azureminerals.com.au
    Competent Person Statement: Information in this report that relates to Exploration Results is based on information compiled by Mr Pat Manouge, who is a Member of The Australasian Institute of Mining and Metallurgy. Mr Manouge is a full-time employee of Azure Minerals Limited. Mr Manouge has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves”. Mr Manouge consents to the inclusion in the documents of the matters based on his information in the form and context in which it appears.
    TABLE 1 - SIGNIFICANT INTERCEPTS FROM DRILLHOLE APR-DD-009
    DRILL HOLE
    FROM
    (m)
    TO
    (m)
    INTERVAL
    (m)
    COPPER
    (%)
    GOLD
    (g/t)
    SILVER
    (g/t)
    APR-DD-009
    82.00
    91.40
    9.40
    12.5
    3.9
    266
    including
    86.00
    86.50
    0.50
    43.9
    5.1
    686
    and
    90.25
    90.75
    0.50
    46.6
    7.2
    873
    130.60
    131.40
    1.40
    20.7
    1.2
    270
    including
    130.60
    131.40
    0.80
    35.6
    1.8
    455
    including
    130.60
    131.00
    0.40
    44.2
    1.4
    508
    Intersections selected are based on sulphide intercepts using a 0.5% copper lower cut-off, no upper cut, with maximum 4m internal dilution. Samples are all HQ quarter core.
    Sample preparation was undertaken by ALS-Chemex (Hermosillo) and analysed by ALS-Chemex (Vancouver) using ICP-AES (for silver and base metals) and Fire Assay / AAS (for gold) methods.
    Certified Reference Standards and blank check samples are inserted at regular intervals to provide assay quality checks. Review of the standard and blank samples are within acceptable limits.
    TABLE 2 – PROMONTORIO DRILL HOLE DETAILS
    DRILL HOLE
    EASTING
    (mE)
    NORTHING
    (mN)
    ELEVATION
    (mASL)
    DIP
    AZIMUTH
    DEPTH
    (m)
    APR-DD-001
    9997
    10096
    2041
    -45
    045
    158.65
    APR-DD-002
    10016
    10021
    2012
    -53
    090
    137.45
    APR-DD-003
    9997
    10096
    2041
    -47
    090
    100.25
    APR-DD-004
    10026
    9999
    2023
    -54
    090
    157.70
    APR-DD-005
    9997
    10096
    2041
    -60
    090
    188.00
    APR-DD-006
    9978
    10060
    2014
    -46
    090
    144.70
    APR-DD-007
    9997
    10096
    2041
    -69
    090
    152.45
    APR-DD-008
    9978
    10060
    2014
    -57
    090
    160.00
    APR-DD-009
    9997
    10096
    2041
    -80
    090
    210.35
    APR-DD-010
    9957
    10063
    2010
    -63
    090
    182.75
    APR-DD-011
    9989
    10013
    2020
    -52
    090
    142.50
    APR-DD-012
    10002
    10050
    2015
    -45
    090
    102.80
    APR-DD-013
    9972
    10148
    2040
    -55
    090
    211.00
    APR-DD-014
    9989
    10013
    2020
    -69
    090
    179.60
    APR-DD-015
    9972
    10148
    2040
    -61
    090
    194.40
    APR-DD-016
    9989
    10013
    2020
    -61
    090
    201.00
    APR-DD-017
    9972
    10148
    2040
    -66
    090
    270.45
    APR-DD-018
    9940
    10026
    2024
    -50
    090
    140.40
    APR-DD-019
    9993
    10099
    2035
    -75
    090
    195.00
    APR-DD-020
    9940
    10026
    2024
    -60
    090
    230.95
    APR-DD-021
    9922
    10140
    2007
    -45
    090
    160.00
    APR-DD-022
    9940
    10026
    2024
    -66
    090
    201.00
    APR-DD-023
    9922
    10140
    2007
    -53
    090
    240.00
    APR-DD-024
    10039
    10035
    2013
    -45
    090
    57.10
    APR-DD-025
    9922
    10140
    2007
    -60
    090
    275.00
    APR-DD-026
    To Be Drilled
    APR-DD-027
    To Be Drilled
    APR-DD-028
    9953
    10065
    2003
    -70
    090
    225.00
    APR-DD-029
    9875
    10099
    2012
    -55
    090
    124.35
    APR-DD-030
    To Be Drilled
    APR-DD-031
    9930
    10101
    2008
    -64
    090
    261.55
    APR-DD-032
    To Be Drilled
    APR-DD-033
    9930
    10101
    2008
    -55
    090
    184.55
    All drillhole collars were surveyed by DGPS with accuracy of +/- 10mm.
    Drillhole coordinates are in local grid, parallel to UTM NAD27 grid.
    All drillholes were down hole surveyed for dip and azimuth at approximately 30 metre intervals down hole.
    Elevation is metres above sea level. Azimuth is true bearing.
    FIGURE 1 – PROMONTORIO DEPOSIT GEOLOGY
 
watchlist Created with Sketch. Add AZS (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.