I reckon that Sue12 would say (if he was a free man) that they will drill a sidetrack and test that lower zone again (perhaps using drilling techniques that will minimize damage to the formation).
I would love to know what unstabilised flow rates they got out of that bottom zone?
I guess what they do next will tell us something about the potential of that bottom zone.
Depressing!
Whippet
I reckon that Sue12 would say (if he was a free man) that they...
Add to My Watchlist
What is My Watchlist?