Read the last qrtly report in relation to your post about possible shutdown early Nov. I see there is to be 2 modifications late October to increase recovery of lighter heavy minerals and achieve full design capacity. These will enhance the overall operating capacity of the wet concentrator plant above that anticipated in the feasible study. This is at the Murray Basin site
BMX
bemax resources limited
Read the last qrtly report in relation to your post about...
Add to My Watchlist
What is My Watchlist?