Last reported depth on 25th May was 4009m for the 9" cemented section at Boreas-1.
Friday's update said that they were drilling out the cement & had pressure tested the casing. BOP was sorted out.
Nxt phase of drilling will b along these lines:
1) Is to drill out the 8.5" section upto apprx 4700m by my estimates (going by their P#2 updates, refer matrix below)
2) This should b their 7" casing point
3) Pressure test & drill out cement
4) Drill the 6" section towards the funzone (ie Montara(?) & Plover reservoir sands).
Here's a rough matrix that I posted a while back, from their last 3 wells. Use P#2 activities as a rough guide for what's nxt. Safe drilling.
Poseidon matrix
- Forums
- ASX - By Stock
- b#1 next phase of drilling
Last reported depth on 25th May was 4009m for the 9" cemented...
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.44 |
Change
-0.045(3.03%) |
Mkt cap ! $1.122B |
Open | High | Low | Value | Volume |
$1.48 | $1.48 | $1.44 | $7.950M | 5.468M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 16364 | $1.44 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.45 | 6448 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 16364 | 1.440 |
7 | 52644 | 1.435 |
10 | 220475 | 1.430 |
5 | 88358 | 1.425 |
19 | 231761 | 1.420 |
Price($) | Vol. | No. |
---|---|---|
1.450 | 3448 | 1 |
1.455 | 75108 | 3 |
1.460 | 58212 | 4 |
1.465 | 5002 | 1 |
1.470 | 7004 | 2 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
KAR (ASX) Chart |