My dream is for S1 S2 and S3 all to hit oil in this channel at about 1700-1800 metres. Then to get a decent rig and drill a 3000 metre horizontal connecting the 3 of them ( or more ).
Now that would put a cat amongst the pigeons because the oil flow would be far greater than the combined output of 3 vertical wells.
But at this stage it is only a dream.
The drill bit does the talking. Roll on Snatcher 2.
Add to My Watchlist
What is My Watchlist?