ITC impress energy limited

back of the envelope...., page-9

  1. tui
    6,159 Posts.
    lightbulb Created with Sketch. 1557
    My dream is for S1 S2 and S3 all to hit oil in this channel at about 1700-1800 metres. Then to get a decent rig and drill a 3000 metre horizontal connecting the 3 of them ( or more ).

    Now that would put a cat amongst the pigeons because the oil flow would be far greater than the combined output of 3 vertical wells.

    But at this stage it is only a dream.

    The drill bit does the talking. Roll on Snatcher 2.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.