ITC impress energy limited

My dream is for S1 S2 and S3 all to hit oil in this channel at...

  1. tui
    6,159 Posts.
    lightbulb Created with Sketch. 1557
    My dream is for S1 S2 and S3 all to hit oil in this channel at about 1700-1800 metres. Then to get a decent rig and drill a 3000 metre horizontal connecting the 3 of them ( or more ).

    Now that would put a cat amongst the pigeons because the oil flow would be far greater than the combined output of 3 vertical wells.

    But at this stage it is only a dream.

    The drill bit does the talking. Roll on Snatcher 2.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.