back off our gov, page-12

  1. 5,500 Posts.
    lightbulb Created with Sketch. 1
    Yeah why would you want a cost/benefit analysis on the most expensive infrastructure project taken on in a long long time?
    -----------------
    Because you use a cost benefit analysis to help you work out your policy which you then take to the electorate to vote on.

    You don't get elected then go work out your policy. Sheesh
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.