RPM 4.48% 7.0¢ rpm automotive group limited

They have the rig under contract as Strat points out.Presumably...

  1. 1,456 Posts.
    lightbulb Created with Sketch. 489
    They have the rig under contract as Strat points out.
    Presumably it costs less if the rig is idle, rather than active (emploee costs, fly-in/out, drilling materials. Just throwing a number up: $150,000 / day versus $300,000 / day.

    As you say, they may be able to sub-lease it.

    Pretty sad state of affairs.

    Need to keep an eye of RAB Energy/Capital regarding their support for the capital raising.

    C
 
watchlist Created with Sketch. Add RPM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.