Have to disagree Ching. The net to gross statement indicates that in the sequence there is 33 to 53 metres of sand reservoir ( 25 to 40% of the 133 m column). The rest is non-reservoir.
I'm concerned that the 23 metres of oil column represents an "interpreted" column and that a shorter column has been intersected in the well. That could be the reason why the insiders fled in droves and why the rumoured placement price is lower.
- Forums
- ASX - By Stock
- HDR
- Banda to be upgraded. Up to 53m oil column!!!!
HDR
hardman resources limited
Banda to be upgraded. Up to 53m oil column!!!!, page-5
-
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)