update just out, only drilled 10 feet this week...
RAN 9 5/8" CSG TO 11110' W/ 890 SXS CMT; N/U & TSTD BOP'S; TSTD CSG; DRLD 10' NEW HOLE; CIRC BTMS UP; PERFORMED FIT, FAILED; RIH W/ RTTS TOOLS TO SQZ SHOE;
here is my attempt at translating it:
cased and cemented hole to 11110', tested blowout preventer, tested casing, circulated BTMS???, performed formation integrity test (FIT) which failed, run in hole with retrievable test treat squeeze (RTTS) tools to sqz (squeeze?) shoe.
TEX Price at posting:
0.0¢ Sentiment: Buy Disclosure: Held