BRK 8.33% 1.3¢ brookside energy limited

Banter and General Comments .. BRK, page-1092

  1. 1,185 Posts.
    lightbulb Created with Sketch. 484
    Looking back at the jewell well pad construction dates, it took about 3 weeks from pad construction announcement to lock in the drill rig (latshaw)

    I’d be expecting the same sort of timelines, so we roughly kicked off pad works around the 27/8, so roughly 3 weeks on from that date will land us between the 13th to 17th September. I’d also expect brookside to go back to latshaw as they are a great drilling company.

    on the horizon also will be the 4c reports due 29th October and with sales coming online (likely this week) we could see an absolute bumper of a report with potentially 7 weeks worth of sales. with a high 1500BOEPD (which I think is likely), we could have turned over 5mil in sales. Short term Brk is looking very compelling! Rinse and repeat my fellow holders
 
watchlist Created with Sketch. Add BRK (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.