BRK 7.69% 1.2¢ brookside energy limited

What it does look like analysing the satellite imagery 16th...

  1. 1,565 Posts.
    lightbulb Created with Sketch. 514
    What it does look like analysing the satellite imagery 16th August just prior to the stimulation completion announcement through 9 images to the current is that clean up crews have completed flow back through temporary storage pits and have now switched to flows through permanent production lines as the majority of frac fluid and proponent has been retrieved.

    What is believed to be seen is changes in discolouration of what might be the temporary storage pit being full, empty and filled in with earth. Around the well head also appears clear of machinery and supporting equipment e.g. coiled tubing rig confirming the above.

    IF the above analysis is correct, this would indicate the flowback is almost complete with the well flowing oil and gas as mentioned through permanent production lines.

    Jewell well may now be on the way to achieving stabilised production, there would still be the remainder of some frac fluid and proponent being retrieved and causing oil and gas production to jump about a little but on the increase in volume numbers.

    Finally once production rates smooth out we will be close to the IP24 rate announcement, this could still be a week away as guidance suggests OR maybe closer than we think.

    Very exciting times ahead.

    Keep well cheers Paul
 
watchlist Created with Sketch. Add BRK (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
-0.001(7.69%)
Mkt cap ! $57.17M
Open High Low Value Volume
1.3¢ 1.3¢ 1.2¢ $62.67K 4.899M

Buyers (Bids)

No. Vol. Price($)
23 16812807 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 22002260 13
View Market Depth
Last trade - 16.10pm 21/06/2024 (20 minute delay) ?
BRK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.