“The 129 MWh Hornsdale Wind Farm project was installed very rapidly on Elon Musk's promised time-table. At the time, Tesla bears said Tesla would never mTesla could have installedeet the schedule. They were wrong. The project used over 600 Powerpacks. However, using the Megapack product, the project ten times faster and used just 43.”
Google the headline below and learn about Tesla’s “Megapack” and the read AC’s post again.
Tesla Energy Storage Potential Given Boost At Company And Industry Levels
- Forums
- ASX - By Stock
- GXY
- Banter and General Comments
Banter and General Comments, page-9127
-
- There are more pages in this discussion • 11,905 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)